|
So You're Expecting Some Beautiful New Flooring . . .
Key check points when having flooring installed by Nebraska Furniture Mart's Professional
Flooring Installers.
Estimation
At the time of sale we will estimate the approximate size and cost of your installation.
The total cost may vary due to adjustments in yardage and/or additional labor charges.
Measure Agents
Our measurers will call the morning of the measure by 12 noon.
Price Approval
Before we order any products of install your floor, we must have your verbal approval
on the exact sizes and costs associated with your job. If you’ve not been contacted
within two days after your measure, please call our Flooring Service Department
at 402-392-3490 or 1-800-359-1200, extension 3490. If price approval is delayed,
your order will not be placed and your installation might not proceed as scheduled.
Scheduled installation dates are based on carpet availability and subject to change.
Specialty Labor
Take-up, removal, stairs, metal trim, subfloor prep or furniture moving may require
extra labor service charges. Please understand that installers will only perform
work shown on the work order. Any extra work required during installation that has
not been discussed with your sales associate and written on the work order, will
require additional charges.
Carpet Removal
To make way for your new carpet and pad, you will need to remove your wall-to-wall
carpet and pad. Please leave the tack strip down and remove remaining pad staples.
Upon request, we will take up and dispose of the existing carpet and pad for a modest
charge. Installers will only dispose of carpet the take up.
Furniture Removal
If Nebraska Furniture will be moving your furniture, please remove all breakable
items first. Disconnect any wiring such as stereo and TV wires. In bedrooms, please
strip beds and remove all items from the tops of dressers
and bottoms of closets. In kitchen and utility rooms please disconnect the washer,
dryer, refrigerator and all gas appliances. Nebraska Furniture Mart installers are
not responsible for disconnecting or reconnecting these items. NFM Installers WILL
NOT dismantle or move waterbeds, grandfather clocks, antiques or any items requiring
calibration or any item that a two-man crew is incapable of moving.
Preparing For Your Installer
Please be sure the power is on for the installer’s electrical tools, and the temperature
in the house is 69 degrees, 24 hours prior to installation. Inatallers will call
the morning of the installation between 7am and 10 am.
Carpet Inspection
When inspecting your new carpet, it could appear slightly different in texture or
color due to normal dye lot differences from the display sample in the store. Newly
installed carpet, when exposed to normal vacuuming, will blossom and take on a closer
appearance to our showroom samples.
Doors
Nebraska Furniture Mart does not cut doors for carpet clearance. The installers
will remove doors to install carpet and replace them, but will not replace doors
if they require trimming.
Carpet Seams
In most installations, carpet seams are common, however no seam is totally invisible.
Due to different textures, patterns and direction of light, some seams may be more
visible than others, Please discuss with your installer any seams you may have questions
about before he leaves your home.
Carpet Waste
After installation you will probably notice some leftover pieces of carpet. This
is normal and due to the fact that most room s are narrower or wider than the standard
12-foot wide carpet. Your installer will collect and bag scrap pieces and vacuum
your new carpet. Larger pieces of carpet will be left for your use.
Baseboards, Walls and Wallpaper
Many carpets now have backing that is highly abrasive to painted or varnished surfaces
and to freshly applied wallpaper. We recommend that freshly painted, or newly wallpapered
walls be allowed to completely dry at least four days prior to installation. Your
installer will take added care to minimize these scratches but minor touch up may
be needed after installation.
Payment
Nebraska Furniture Mart flooring orders marked Balance Before Delivery (BBD) that
are not paid in full five days prior to installation will not be installed on the
set date and will need to be rescheduled when payment is received.
ENJOY YOUR NEW FLOORING FROM NEBRASKA FURNITURE MART!
|